Gridworks was established in 2019 as a dedicated platform for development and investment in Africa’s electricity networks, investing in transmission, distribution and distributed energy utilities, both on and off-grid. Owned and funded by the British Government, it is a subsidiary of British International Investment, the UK’s development finance institution. While recent decades have seen significant investment in power generation across Africa to address the need for reliable electricity, creating sustainable, efficient and reliable power sectors requires significant and targeted investment in the networks that transmit and distribute that power.

KuaSolar Uganda specialises in a diverse range of solar products and appliances. Founded in 2020, it is the sister company of UK-based Africa Power Ltd. Major ongoing projects include technical support for Mossie-Go field trials in Jinja and Buikwe, verifying Mossie-Go’s ability to reduce malaria case rates, in collaboration with the Malaria Consortium, Arctech Innovation and the Ministry of Health’s Vector Control Division. KuaSolar Uganda is also engaged in testing and supporting the adoption of its solar-powered fishing light technology to enhance sustainable fishing practices in Uganda.k

Infra Consulting Services Limited (ICS) is an international firm of consultants based in the United Kingdom that took over, through a management buy-out, URS (formerly Scott Wilson) operations in East Africa. ICS therefore brings over 60 years of Scott Wilson’s East African operations and provides a full range of integrated planning, management and engineering services across the transport, property, and environment and natural resources sectors.

EACOP is a 1,443 km crude oil export pipeline that will transport Uganda’s crude oil from Kabaale, Hoima in Uganda to the Chongoleani Peninsula near Tanga port in Tanzania, with a peak capacity of 246,000 bbls/day. The first 296 km are in Uganda and the remaining 1,147 km in Tanzania. The 24-inch insulated pipeline will be buried along its entire length, with the top of the pipe one metre below the surface; topsoil and surface vegetation will be reinstated so people and animals can pass freely across, and the pipeline will pass under crossing points with roads, rail lines and cables. Due to the physical characteristics of Uganda’s crude, the oil must be maintained above 50°C; oil received from Tilenga and Kingfisher will be above this temperature, and the pipeline can warm the oil using an electrical trace heating system if required during stoppages or low flow rates.